ANSI/NEMA CC 1-2009 (R2015) PDF

ANSI/NEMA CC 1-2009 (R2015) PDF

Name:
ANSI/NEMA CC 1-2009 (R2015) PDF

Published Date:
05/19/2009

Status:
Active

Description:

Electric Power Connection for Substations

Publisher:
American National Standards Institute / National Electrical Manufacturers Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$Free Download
Need Help?
This standard covers uninsulated connectors and bus supports that are made of metal and intended for use with conductors or bus made of copper or aluminum alloy and found in substations. Connectors that are supplied in equipment are covered by the equipment standards and are excluded from this standard.
ANSI : ANSI Approved
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 65
Product Code(s) : 100241, 100241
Published : 05/19/2009

History

ANSI/NEMA CC 1-2018 (R2023)
Published Date: 12/14/2018
Electric Power Connection for Substations
$58.5
ANSI/NEMA CC 1-2009 (R2015)
Published Date: 05/19/2009
Electric Power Connection for Substations
Free Download
ANSI/NEMA CC 1-2005
Published Date: 01/01/2005
Electric Power Connection for Substations
Free Download

Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138